{"id":638,"date":"2014-03-07T17:03:32","date_gmt":"2014-03-07T17:03:32","guid":{"rendered":"http:\/\/profs.hsu.ac.ir\/eskandari\/?page_id=38"},"modified":"2020-03-06T07:07:35","modified_gmt":"2020-03-06T07:07:35","slug":"courses-2","status":"publish","type":"page","link":"https:\/\/staff.hsu.ac.ir\/eskandari\/courses-2\/","title":{"rendered":"Courses"},"content":{"rendered":"<ol>\n<li><a href=\"http:\/\/staff.hsu.ac.ir\/eskandari\" target=\"_blank\" rel=\"noopener noreferrer\">Advance Concrete Technology<\/a><\/li>\n<li><a href=\"http:\/\/staff.hsu.ac.ir\/eskandari\" target=\"_blank\" rel=\"noopener noreferrer\">Concrete Technology<\/a> (\u0633\u0631\u0641\u0635\u0644,\u062c\u0632\u0648\u0647\u060c \u0633\u0648\u0627\u0644\u0627\u062a \u0627\u0645\u062a\u062d\u0627\u0646\u06cc)<\/li>\n<li><a href=\"http:\/\/staff.hsu.ac.ir\/eskandari\" target=\"_blank\" rel=\"noopener noreferrer\">Structural Optimization<\/a><\/li>\n<li>\u00a0Construction concrete Structures<\/li>\n<li>\u00a0Concrete Technology Lab.<\/li>\n<li>\u00a0Construction Method I<\/li>\n<li>\u00a0Project Control and Scheduling Methods<\/li>\n<li>\u00a0Site Preparation, Construction and Operation<\/li>\n<li>\u00a0Construction Method II<\/li>\n<li>\u00a0Machinery<\/li>\n<li>\u00a0Com. App. in Construction Management<\/li>\n<li>\u00a0Vector mechanics of Engineering, Statics.<\/li>\n<li>\u00a0Laws and Relations work<\/li>\n<li>\u00a0Cost- Analysis&amp; Estimation<\/li>\n<li>\u00a0Acoustic Emission Analysis<\/li>\n<li>\u00a0Project Control and Scheduling Methods<\/li>\n<li>\u00a0Advanced Fracture Mechanics<\/li>\n<li>\u00a0Operation Research<\/li>\n<\/ol>\n","protected":false},"excerpt":{"rendered":"<p>Advance Concrete Technology Concrete Technology (\u0633\u0631\u0641\u0635\u0644,\u062c\u0632\u0648\u0647\u060c \u0633\u0648\u0627\u0644\u0627\u062a \u0627\u0645\u062a\u062d\u0627\u0646\u06cc) Structural Optimization \u00a0Construction concrete Structures \u00a0Concrete Technology Lab. \u00a0Construction Method I \u00a0Project Control and Scheduling Methods \u00a0Site Preparation, Construction and Operation \u00a0Construction Method II \u00a0Machinery \u00a0Com. App. in Construction Management \u00a0Vector mechanics &hellip; <a href=\"https:\/\/staff.hsu.ac.ir\/eskandari\/courses-2\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-638","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/staff.hsu.ac.ir\/eskandari\/wp-json\/wp\/v2\/pages\/638","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staff.hsu.ac.ir\/eskandari\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/staff.hsu.ac.ir\/eskandari\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/staff.hsu.ac.ir\/eskandari\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/staff.hsu.ac.ir\/eskandari\/wp-json\/wp\/v2\/comments?post=638"}],"version-history":[{"count":3,"href":"https:\/\/staff.hsu.ac.ir\/eskandari\/wp-json\/wp\/v2\/pages\/638\/revisions"}],"predecessor-version":[{"id":1010,"href":"https:\/\/staff.hsu.ac.ir\/eskandari\/wp-json\/wp\/v2\/pages\/638\/revisions\/1010"}],"wp:attachment":[{"href":"https:\/\/staff.hsu.ac.ir\/eskandari\/wp-json\/wp\/v2\/media?parent=638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}